TenderStead
← Back to tenders
award fts 45000000

Traction Power & Earthing Upgrades - Phase 1 Works

Transport for Greater Manchester

Value
Not stated
Closing date
—
Published
26 Aug 2025
Status
complete
Region
UK
Postcode
M1 3BG
Category
works
CPV
45000000 — Construction work

Description

TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.

Similar open tenders