Kishorn East Reclamation and Dry Dock Enlargement
Kishorn Port Limited
- Value
- Not stated
- Closing date
- —
- Published
- 25 Jun 2025
- Status
- complete
- Region
- UKM6
- Postcode
- IV15 9HA
- Category
- works
- CPV
- 45248200 — Dry docks construction work
Description
Kishorn Port Limited own and operate the Dry Dock facility at Kishorn. The existing Dry Dock is to be enlarged by forming a cutting 100m long and 60m wide into the rock foreshore. The rock material blasted and removed will be used to reclaim 8.5 hectares of foreshore land to the east of the Dry Dock. Access roads are to be repositioned around the new works. The Contractor will design the blasting elements of the Works.