TenderStead
← Back to tenders
planningUpdate fts 34000000

Materiel Distribution Land (MDL) Heavy Equipment Transporter (HET) PME RFI

Defence Equipment and Support

Value
£315,000,000
Closing date
—
Published
30 Jun 2025
Status
planned
Region
UKK12
Postcode
BS34 8JH
Category
goods
CPV
34000000 — Transport equipment and auxiliary products to transportation

Description

The Ministry of Defence (the Authority) under the Materiel Distribution Land (MDL) programme is developing a requirement project for Heavy Equipment Transporter (HET) platform. Initially circa 70 to 90 vehicles with an integrated support solution service for an initial period of ten years, with potential options to increase the acquisition volume and extend beyond the initial support period. Aspirational Full Operating Capability (FOC) is June 2029. This requirement aims to introduce a new, technologically advanced system for the delivery of heavy and out-of-gauge equipment, with a minimum threshold of eighty-five (85) metric tonnes, featuring improved low mobility lift capabilities. This system will significantly improve and sustain the operational movement of heavy, mission-critical equipment well into the future. The primary role is to transport heavy armoured equipment, including armoured fighting vehicles (AFVs) and main battle tank (MBT), but it must also be capable of moving lighter equipment into the theatre of operations. Additionally, this equipment will be used during peacetime for training delivery both in the UK and overseas. A PIN has previously been released for this requirement reference 2025/S 000-002913.

Similar open tenders