B80 & B33 CID system maintenance
Sellafield Ltd (West Cumbria Hse)
- Value
- Not stated
- Closing date
- —
- Published
- 24 Apr 2025
- Status
- complete
- Region
- UKD11
- Postcode
- CA14 4HB
- Category
- —
- CPV
- —
Description
Mirion to attend site on an annual basis to carry out annual maintenance to the B80 & B33 CID System following the requirements in the Annual Maintenance Test Document as follows: • Section 1.9 Visual Inspection. • Section 2 Input Testing • Section 3 Output Testing • Section 4 Diagnostics, 4.1, 4.2, 4.3, 4.4 (full subset) • Section 5 CEU Equipment Field Connection Listings. • Section 6 Signal Flow Test • Section 7 System Operating Parameters, 7.1, 7.2, 7.3, 7.4 Additional the following tests/maintenance to be included to ensure compliance with ES-1-2501-1 • Cleaning of all heat sinks, filters and vents in the CID panel. Documentation to be provided by the contractor to include as a minimum detailed Method Statement or Maintenance Instruction, Risk Assessment detailing all of the work to be carried out. 2). Mirion to attend site to repair any faults that the “in house” craft/engineering teams cannot support within 48 hours