Supply of substation environmental monitoring equipment.
Scottish Hydro Electric Power Distribution plc
- Value
- Not stated
- Closing date
- —
- Published
- 03 Jul 2024
- Status
- complete
- Region
- UK
- Postcode
- PH1 3AQ
- Category
- goods
- CPV
- 31682540 — Substation equipment
Description
Substation design often provides large control buildings that are made of metal, and temperature swings are significant which can impact operations. Most substation sites have multiple rooms and areas which contain key Operational Technology (OT) equipment in locations separate from the OT Panel. SSEN Distribution requires environmental monitoring equipment which can produce alerts from substations to the control room, allowing environmental issues to be dealt with before incidents occur which could impact the operational technology and customer supply.